+34 93 622 2146 protecmed@protecmed.com
IS | IN

News

leached osmosis
07
Apr

PROTECMED starts up the CMR de Loeches leachate and wastewater treatment plant

PROTECMED carries out the start-up of the treatment plant for liquid waste and leachates generated in the CMR Environmental Complex of the Mancomunidad del Este in Loeches. The treatment system consists of a first physical-chemical phase followed by a two-stage reverse osmosis concentrative system with channel RO modules ...
Life-Spot-Team
08
Jan

Kick-off del proyecto LIFE SPOT

The LIFE SPOT project starts: Green solutions for treating Groundwater pollution to meet drinking water Directive standards It aims to develop a system, which combines the action of algae and bacteria with cork, to reduce nitrates, pesticides, up to 80% ... .
infiltration rafts Sant Vicenç dels Horts PROTECMED
15
Oct

PROTECMED carries out the construction management of the infiltration rafts of Sant Vicenç dels Horts for the ACA

PROTECMED ends the construction management and the guarantee period of the infiltration basins of Sant Vicenç dels Horts for the Catalan Water Agency. In 2010 the rafts were put into operation within the framework of the European project LIFE + ENSAT (“Enhancement of ...
sewage treatment plant
17
Sep

PROTECMED designs and builds a treatment plant for leachate treatment

PROTECMED realiza el diseño, la construcción y la puesta en marcha de una depuradora para tratamiento de lixiviados con una capacidad de 100 m3/d. El proceso consiste en un sistema biológico BRM con membranas de ultrafiltración, seguido de un tratamiento físico-químico como...
01
Jul

PROTECMED endorses European project LIFE + RELEACH

Start of the LIFE + RELEACH project together with CTM, TYPSA, the Catalan Waste Agency and the Bages Consortium. The current leachate management processes consume a large amount of energy and chemical reagents, causing a high environmental and economic impact. East...
06
Jun

PROTECMED Expands Headquarters

We have doubled the head offices surfece in same building in Sant Cugat del Vallès changing Office No. 16 to no. 1 of the plant in INBISA building
12